work with water 01, 2018
installation: 3 X 6 X 10 feet
steel, polymers, silk, paper, concrete, water, water pump
work with water 01 was installed at the Carrack Modern, constructed of steel found objects, wire, and strips of paper and silk marked with implied text.
Over three weeks, water was pumped to run down the piece in a cycle - running into a basin at the bottom and pumped back to the top - corroding the work and its supports.


|